Acoustic louvres support better learning outcomes at Templeton Primary School

PROJECT:

Acoustic louvre and acoustic louvre door supply

INDUSTRY TYPE:

Primary Education

CLIENT:

May Constructions

LOCATION:

Templeton Primary School, VIC

Initial project requirements:

Templeton Primary School required a new HVAC system that would not impact key learning areas with unwanted noise. To deliver the project, builders May Constructions required durable, fit-for-purpose acoustic louvres and doors that would be delivered within tight construction timelines.

The project required a supplier capable of providing site-specific technical guidance, reliable manufacturing, and seamless coordination from start to finish.

 

Flexshield solution:

The Flexshield team supplied a custom-built acoustic louvre system designed for optimal performance, longevity, and easy installation.

Scope of works included:

  1. Acoustic louvres
    1. 5200mm x 3970mm x 100mm total structure
    2. Eight (8) modular panels at 1300mm x 1985mm x 100mm (42kg per module)
    3. Modular sizing allowed for safer handling on-site and streamlined installation.
  2. Acoustic louvre doors
    1. 2600mm x 2530mm x 100mm total structure
    2. Two (2) modules at 1250mm x 2480mm with door jambs (49kg per module)
    3. Doors were supplied pre-hung and swung in the frame, with site alike keying reducing on-site labour and installation errors.

Additional inclusions:

  1. Powder-coated Dulux finish

Delivers long-term resistance to weathering while maintaining a clean, professional appearance.

  1. Pre-fitted bird wire mesh

Prevents pest ingress while allowing free airflow, with no need for post-install modifications.

  1. Site consultation by a Flexshield technician

Ensured accurate measurements, clear access planning, and a delivery schedule aligned with site activity.

  1. Hardware included and factory-fitted

Allowed reduced preparation time on-site and simplified coordination for May Constructions.

Results achieved:

Flexshield’s end-to-end involvement helped May Constructions deliver a clean, professional outcome without disrupting the school’s operations. The acoustic louvre system met all functional requirements, reducing noise while maintaining ventilation and preserving site aesthetics.

The project’s builders appreciated the simplified installation process, hands-on technical advice, and the delivery schedule that kept the project moving forward. Templeton Primary School has implemented a solution that supports student comfort, wellbeing, and output, aligning with Flexshield’s long-standing focus on health, safety, and productivity.

For a detailed assessment and consultation, call Flexshield on 1300 799 969 or contact us online.