Siemens Energy, through their contractor CES Construction NQ Pty Ltd, required a high-performance acoustic enclosure for critical equipment at the Townsville Power Station. The goal: to reduce noise emissions, enhance safety, and comply with engineering and operational standards.
Key requirements included:
To meet Siemens Energy’s high standards, the Flexshield team designed and delivered a complete Sonic System V50 acoustic enclosure. To ensure precise coordination across design, delivery, and installation, Flexshield managed the project in close collaboration with CES Construction and our partners AcousTech.
Scope of works included:
Delivered system specifications
The Flexshield team delivered a high-performing enclosure that ticked every box:
By responding with precision and flexibility, Flexshield once again demonstrated the value of supplying not just parts, but engineered solutions. The result? An acoustic solution that works first time, every time.
For a detailed assessment and consultation, call Flexshield on 1300 799 969 or contact us online.